Projects

Guard rail and bollard installation
Over various projects including road slabs during Night Shift including Excavation, formwork, reinforcement and installation of Calcium High Strength Concrete.
Sydney Metro MSB Concrete Works including concrete footings, concrete wall, Concrete topping slabs over precast panels, HV insitu Pits and misc. concrete works
Tap 3 Concrete works including 3 x Concrete Lift pits and shafts, Concrete stairs and retaining walls.
Concrete Piled Barrier Wall including piling, concrete capping beam and barrier wall – over 200lm
Post and Panel Retaining Wall including devegetation, piling, post installation, Precast manufacturing, Precast installation and backfil
Coping reconstruction in heritage station
Coping reconstruction including the demolition and excavation of the existing concrete coping and reinstatement with high early strength bag mix (CTS concrete mix) during weekend possession. Works also include painting and installation of tactiles
Full platform reconstruction including demolition, excavation, blinding slab, installation of precast culverts, backfill, new service conduits and pits, new concrete slab, tiling and tactile installation